Chief Minister’s Solar Rooftop Capital Incentive Scheme
Chief Minister’s Solar Rooftop Capital Incentive Scheme is a capital subsidy scheme by the Tamil Nadu Government. In this scheme, a capital subsidy of ₹ 20,000 per kilowatt is provided for grid-connected domestic solar PV systems in addition to the 30% subsidy scheme* of the MNRE.
Who can apply
Eligibility for Consumer The scheme is open to applicants from individual homes/flats and residential flats, having an electricity connection.
Eligibility for Vendor / Installer Qualified Solar Installers empanelled by the Tamil Nadu Energy Development Agency through a tendering system under this scheme (www.teda.in/pdf/CIS_INSTALLERS.pdf)
How to apply
Online
Documents to carry
- Duly filled out online application form.
- Proof of possession of premises such as ownership document or lease agreement.
- Proof of Identity (Aadhaar Card, Voter ID Card, or Passport)
- Proof of address such as electricity bill, telephone bill, or ration card.
- Site plan and building layout plan indicating the location of the solar rooftop system.
- Structural stability certificate from a structural engineer.
- NOC from the electricity distribution company.
- Details of the solar rooftop system such as technical specifications, warranty, and performance guarantee.
- Proof of payment for the solar rooftop system.
- Bank account details for the transfer of the capital subsidy.
- Any other document as required by TEDA.
Details
Chief Minister’s Solar Rooftop Capital Incentive Scheme is a capital subsidy scheme by the Tamil Nadu Government. In this scheme, a capital subsidy of ₹ 20,000 per kilowatt is provided for grid-connected domestic solar PV systems in addition to the 30% subsidy scheme* of the Ministry of New and Renewable Energy (MNRE) of the Government of India. For individual homes/flats, the solar system capacity shall be 1 kW. For the residential flats solar system capacities of 5 kW, 10 kW, and multiples thereof can be applied for common usage as a group application. (* limited to 30% of MNRE benchmark cost or 30% of the project cost, whichever is less)